©
DAVID CARR-SMITH 2005 : all images
& text are copyrighted - please accredit text quotes - image reproduction
must be negotiated via [email protected]
Key
F11 for full-screen on/off.
Click
on images to enlarge.
CONTENTS | 4 SITES | TETTERODE | DE LOODS | EDELWEIS | APPENDICES | NOTES | SUB-SITES |
BOOK: DAVID CARR-SMITH - IMPROVISED ARCHITECTURE IN AMSTERDAM INDUSTRIAL SQUATS & COLLECTIVES
"TETTERODE" SQUAT 1981-/COLLECTIVE 1986 to-- - p12 (of 18)
DACOSTAKADE: HARTCAMP APARTMENTS
<
TETTERODE - p1: INTRODUCTION <
< TETTERODE -
p2: PUBLIC-USE & WORK-SPACES <
<
TETTERODE - p3: RESIDENTIAL DOMAINS <
< TETTERODE - p4: DACOSTAKADE BUILDINGS: MERKELBACH & HARTCAMP <
< TETTERODE - p5: DACOSTAKADE: MERKELBACH APTS - mb//mb1/mb2 <
< TETTERODE - p6: DACOSTAKADE: MERKELBACH APTS - mb3 <
< TETTERODE - p7: DACOSTAKADE: MERKELBACH APTS - mb4 <
< TETTERODE - p8: DACOSTAKADE: MERKELBACH APTS - mb5/mb6 <
< TETTERODE - p9: DACOSTAKADE: HARTCAMP APTS - hc//hc1/hc2 <
< TETTERODE - p10: DACOSTAKADE: HARTCAMP APTS - hc3 <
< TETTERODE - p11: DACOSTAKADE: HARTCAMP APTS - hc4(1) <
TETTERODE - p12: DACOSTAKADE: HARTCAMP APTS - hc4(2)
> TETTERODE - p13: DACOSTAKADE: HARTCAMP APTS - hc5/hc6 >
> TETTERODE - p14: BILDERDIJKSTRAAT BUILDINGS >
> TETTERODE - p15: BILDERDIJKSTRAAT APTS - bd//bd1 >
> TETTERODE - p16: BILDERDIJKSTRAAT APTS - bd2 >
> TETTERODE - p17: BILDERDIJKSTRAAT APTS - bd3 >
> TETTERODE - p18: BILDERDIJKSTRAAT APTS - bdN >
.
HARTCAMP HOMES & STUDIO-APTS - cont
Level-4 enclave is ahown on this and the previous page.
RADBOUD HOUTMAN - [recorded:
2008]
GER BERGEVOET & INA v d HEUVEL - [recorded:
1990/93 & 2008]
MIKEL v GELDEREN - [recorded:
1993 & 2008]
GASTON
TEN HORN & MARION DE BEER - [recorded: 2008]
Shown here are two of the enclave's five living-spaces:
.
HARTCAMP: hc-L4 ENCLAVE LIVING-SPACES - cont ...
.
![]() |
||
HARTCAMP 1993: PLAN - LEVEL 4 ENCLAVE [hc-L4] (Architect-Drawing 1986 / info 1993 / top is EEN) |
HARTCAMP: PLAN - LEVEL 4 ENCLAVE [hc-L4] (Plan: Mikel van Gelderen 2006 / info 2008 / top is EEN) |
.
MIKEL VAN GELDEREN APT (1986 -) (hc-L4 / E-side S - 2 bays) [recorded 1993 / 2008]
Mikel, with
Radboud, Ger and Gaston, divided Hartcamp's level-5 in 1986. During its construction between Feb and Dec 86
Mikel lived in the Bilderdijk building. At first he
occupied only the north bay of the new living-space, its south bay was
reserved as the enclave's shared space but it was hardly used; in 1988 he moved his kitchen
into its photographic dark-room portion (which it still occupies)
- and in 1990 he acquired the whole south bay which he used as his painting
studio until 2005 when the entire two-bay living space was redeveloped as a
domestic apartment.
.
MIKEL APT (in 8-1993)
|
|
|
MIKEL:
N-BAY MEZZANINE At this time Mikel occupied 2 adjoining bays - this N-bay was domestic, the S-bay (entered through the door pic-left) was his painting studio. |
|
.
MIKEL APT (in 4-2008) ... in process
In 2005 Mikel redesigned and renovated his whole apartment as a domestic space, added a private bathroom/wc and removed his art-working to a shared studio in Merkelbach [ref:p8: mb5 - KATHY HOYER STUDIO] - the whole work took about 7 months. The L4 enclave's height is 4.2m - Mikel raised his main living-space floor by 0.2m. Support for the N-Mezzanine's 'hanging back' came from Bührmann.
.
GASTON TEN HORN & MARION DE BEER APT (1986 -) (hc-L4 / E-side
centre - 2 bays) [recorded 2008]Gaston, with Radboud, Ger and Mikel, divided Hartcamp's level-5 in 1986. From 86 to 95 Gaston occupied only the single north bay (with mezzanine), using it only as a studio and living outside Tetterode; he also rented a space in the Merkelbach basement [Ref: Work-Places] as a store and dark-room. In 1995 he acquired the second (south) bay and in about 6 weeks of work (with some assistance) established the main features of the present apt; work on this continued "on and off" for about 6 months. In 1999 the whole family moved into this living-space.
This three person family home is very precisely fitted into a relatively small two-bay space. Its main floor area is 59m² plus two mezzanines (which extend over the enclave corridor) of 31m² - a total area of 90m².
NOTE: Wood "beams" (joists?) are mostly new, some 2nd hand.[ - add info on sources of structure and fittings].
.
<
TETTERODE - p1: INTRODUCTION <
< TETTERODE -
p2: PUBLIC-USE & WORK-SPACES <
<
TETTERODE - p3: RESIDENTIAL DOMAINS <
< TETTERODE - p4: DACOSTAKADE BUILDINGS: MERKELBACH & HARTCAMP <
< TETTERODE - p5: DACOSTAKADE: MERKELBACH APTS - mb//mb1/mb2 <
< TETTERODE - p6: DACOSTAKADE: MERKELBACH APTS - mb3 <
< TETTERODE - p7: DACOSTAKADE: MERKELBACH APTS - mb4 <
< TETTERODE - p8: DACOSTAKADE: MERKELBACH APTS - mb5/mb6 <
< TETTERODE - p9: DACOSTAKADE: HARTCAMP APTS - hc//hc1/hc2 <
< TETTERODE - p10: DACOSTAKADE: HARTCAMP APTS - hc3 <
< TETTERODE - p11: DACOSTAKADE: HARTCAMP APTS - hc4(1) <
TETTERODE - p12: DACOSTAKADE: HARTCAMP APTS - hc4(2)
> TETTERODE - p13: DACOSTAKADE: HARTCAMP APTS - hc5/hc6 >
> TETTERODE - p14: BILDERDIJKSTRAAT BUILDINGS >
> TETTERODE - p15: BILDERDIJKSTRAAT APTS - bd//bd1 >
> TETTERODE - p16: BILDERDIJKSTRAAT APTS - bd2 >
> TETTERODE - p17: BILDERDIJKSTRAAT APTS - bd3 >
> TETTERODE - p18: BILDERDIJKSTRAAT APTS - bdN >
.
CONTENTS | 4 SITES | TETTERODE | DE LOODS | EDELWEIS | APPENDICES | NOTES | SUB-SITES |